Loading ...
Loading ...
Loading ...
Installation
English24
English
Installation checklist
The dryer is plugged into a properly grounded outlet.
All packaging material is completely removed and properly disposed.
The dryer is level and standing rmly on the oor.
The long drain hose is installed if you want water captured by the drying process
drained automatically.
Start the dryer to make sure that it runs, heats, and shuts off.
Run a TIME DRY cycle for 20 minutes to see if the HC information code is displayed. If
this is the case, contact a local service center.
After installation, we recommend that you wait at least 1 hour before using the dryer.
Before using the dryer
Make sure no accessory remains inside the drum.
Plug in the power cord just before operating the dryer.
Do not block the air inlet hole of the cooling grill at the front of the dryer.
Do not place ammable objects near the dryer and keep the surrounding area clean.
Keep the dryer level with the ground.
Do not remove the adjustable levelling legs of the dryer. They are necessary to keep
the dryer level.
DV6900B_LED_WEB_Heatpump_EN.indd 24 2022/6/23 16:15:50
Loading ...
Loading ...
Loading ...