Loading ...
Loading ...
Loading ...
English
English 19
Remove the terminal block cover plate.
Insert the power cord with a UL-listed strain relief through the hole provided in the
cabinet near the terminal block.
A strain relief must be used.
Do not loosen the nuts already installed on the terminal block. Be sure they are tight.
Use a 3/8” (1 cm) deep well socket.
Since january 1, 1996, The national electric code requires that new wiring (not existing)
utilize a 4-wire connection to this dryer.
STEP 2 Level the dryer
Before you install the dryer, make sure you have read the Installation requirements on
page 9. Please note that the following instructions are for installation without using a
drain hose. For instructions on using a drain hose, see the next section, Drain hose (if
necessary) on page 20. For convenience, consider installing the dryer next to your washer.
A
B
1. Carefully move the dryer to the desired
location.
2. Use a level (A) and check the levelness
of the dryer from side to side and front
to back.
3. If the dryer is not level, adjust the
levelling legs (B). Turning a leg counter-
clockwise retracts the leg. Turning a leg
clockwise extends the leg.
4. Once the dryer is level, make sure the
dryer stands rmly on the oor.
5. Plug in the dryer.
DV6900B_LED_WEB_Heatpump_EN.indd 19 2022/6/23 16:15:48
Loading ...
Loading ...
Loading ...