ShelterLogic 62667 RoundTop 13 x 20 x 10 Gray Fabric Instant Carport Shelter

TEMPORARY STRUCTURE - Page 9

For 62667.

PDF File Manual, 15 pages, Read Online | Download pdf file

62667 photo
Loading ...
Loading ...
Loading ...
05_62667_J0
9
6. PROPERLY ANCHOR THE FRAME
A. Frame MUST be anchored BEFORE installing the cover and end panels. Anchors must be placed
inside shelter at the corner legs. Insert a ¾-inch pipe or steel rod through the eyelet of the auger and turn
the anchor clockwise until the eyelet is 2 to 3 inches out of the ground.
B. Thread cable provided through the eyelet of the Anchor as indicated. Secure the cable with the clamps
provided (hand-tighten at this time). Do not cut the excess off the cable; these cables will be resecured in
their permanent position in Step 9 once the cover rails are installed.
a.
c.b.
d. e.
x4
10015
10014
10016
10014
10014
10014
10014
If soil is too compact, dig
a hole with a shovel or
post hole tool. Set anchor
in hole and rell. For a
stronger, more secure
installation, ll hole with
quick-set cement.
Loading ...
Loading ...
Loading ...