ShelterLogic 62667 RoundTop 13 x 20 x 10 Gray Fabric Instant Carport Shelter

TEMPORARY STRUCTURE - Page 13

For 62667.

PDF File Manual, 15 pages, Read Online | Download pdf file

62667 photo
Loading ...
Loading ...
Loading ...
05_62667_J0
13
8. COVER INSTALLATION
A. Lay the cover on the ground next to the
frame with the inside of the cover (the side
with the pipe pockets) facing down and the
webbing on the front and rear of the corner
of the building. Position the cover so that it is
centered to the frame, front to back. Fig. A
B. Fold over the side closest to the frame so
the pipe pocket is now accessible. Temporarily
insert a cover rail at the rst middle rib from
the front
(a) and the rst middle rib from the
rear
(b) so that it is inserted in the pipe pocket
on both ends of the pipe but the center of the
pipe is exposed. For long buildings it may be
necessary to use additional pipes in the middle.
Fig. B.
C. Tie the rope on each of the exposed pipes
and throw the other end of the rope over the
frame. Fig. C.
D. Move to the other side of the frame and pull
the cover over the frame with the rope. This
may require two or more people.
Fig. D.
A.
B.
D.
C.
a
b
Loading ...
Loading ...