SereneLife SLIGEN2200 Portable Inverter Generator

SLIGEN2200 - Manuals - Page 29

For SLIGEN2200.

PDF File Manual, 34 pages, Read Online | Download pdf file

SLIGEN2200 photo
Loading ...
Loading ...
Loading ...
www.SereneLifeHome.com 29
VI. STORAGE AND
TRANSPORTATION
Storage
The generator set should be started at
least once every 2 weeks and allowed
to run for at least 20 minutes. Follow
the instructions below for longer term
storage if the generator set will be out
of service for 2 months or more.
DANGER
Fire or explosion
Gasoline is highly flammable and
extremely explosive. Empty the fuel
tank and shut off fuel valve before
storing or transporting this generator
set.
1. AIlow the generator set to cool
completely before storage.
2. Clean the generator set according to
instructions in Maintenance section.
3. Drain all fuel completely from the
fuel tank, fuel hose and carburetor to
prevent gum from forming.
4. Close the fuel switch to cut down
fuel supply.
5. Remove the appearance cover plate.
Unscrew the oil dipstick and slightly
tilt the whole set to pour out the oil.
6. Remove the spark plug and pour
about 15ml. of oil into the cylinder.
Pull the recoil starter slightly to
distribute the oil and lubricate the
cylinder. And then attach the spark
plug.
7. Store the unit in a clean, dry area out
of direct sunlight.
Transportation
To prevent fuel spillage when trans-
porting or during temporary storage,
the generator set should be secured
upright in its normal operating position,
with the engine switch OFF. The ON/RUN
switch should be turned OFF.
WARNING
When transporting:
Do not overfill the tank. Do not operate
the generator set while it is on vehicle.
Take the generator set off the vehicle
and use it in a well-ventilated place.
Avoid a place exposed to direct sunlight
when putting the generator set on a
vehicle. If the generator set is left in an
enclosed vehicle for many hours, high
temperature inside the vehicle could
cause fuel to vaporize resulting in a
possible explosion.
Do not drive on a rough road for an
extended period with the generator
set on board. If you must transport the
generating set on a rough road, drain
the fuel from the generator set before-
hand.
Loading ...
Loading ...
Loading ...