Samsung DVE45B6305C/AC - 7.5 Cu.ft Dryer With Multi Steam And Steam Sanitize

User Manual - Page 28

For DVE45B6305C/AC. Also, The document are for others Samsung models: DVE(G)45B6305*, DVE45B6305C

PDF File Manual, 124 pages, Read Online | Download pdf file

DVE45B6305C/AC photo
Loading ...
Loading ...
Loading ...
English
Installation
English28
STEP 3 Connect the electrical wiring (for electric models)
Before connecting the electrical wiring, make sure you have read the Electrical requirements” section on
page 22.
3-wire system
A B C L2 L1
D
E
A. External ground connector
B. Neutral grounding wire (white)
C. Center silver-colored terminal block
screw
D. Neutral wire (white or center wire)
E. 3/4” (1.9 cm) UL-listed strain relief
1. Loosen or remove the screws from the center
terminal block.
2. Connect the neutral wire (white or center wire) of the
power cable to the center, silver-colored terminal
screw of the terminal block. Tighten the screws.
3. Connect the other wires to outer terminal block
screws. Tighten the screws.
4. Tighten the strain relief screws.
5. Insert the terminal block cover into the rear panel of
the dryer. Then, secure the cover with a hold-down
screw.
CAUTION
To convert from the 4-wire system to 3-wire system,
connect the ground strap to the terminal block
support to ground the dryer frame to the neutral
conductor.
Ring-type terminals are recommended. If using strap
terminals, make sure they are tightened.
Connect the power cord and check L1/L2/N voltage.
If the voltage is low, it may not heat properly. Review
the “Electrical requirements” section on page 22 if
needed.
Untitled-19 28 2022-09-05  2:49:42
Loading ...
Loading ...
Loading ...