Greenworks PA271K 24V Cordless Battery Compact Router w/ 2.0Ah Battery & Charger

OPERATOR MANUAL - Page 9

For PA271K. Also, The document are for others Greenworks models: PA371

PDF File Manual, 20 pages, Read Online | Download pdf file

PA271K photo
Loading ...
Loading ...
Loading ...
1 Wrench 2 Loosen
3 Tighten 4 Collet nut
1
1 Shaft lock
NOTE
The shaft lock may not return to the original position
when you tighten the collet nut at the installation of the
router bit. The shaft lock returns to the original position
when you start the tool.
3. To remove the bit, follow the installation procedure in
reverse.
10.4 INSTALL OR REMOVE THE
ROUTER BASE
1. Open the lock lever of the router base, then insert the tool
into the router base aligning the groove on the tool with
the protrusion on the router base.
1
1 Lock lever
2. Close the lock lever.
3. Attach the dust nozzle to the router base, and then tighten
the thumb screw.
1
2
2
1 Dust nozzle 2 Thumb screw
4. To remove the base, follow the installation procedure in
reverse.
11 OPERATION
WARNING
Read all safety warnings, instructions, illustrations and
specifications provided with this power tool. Failure to
follow the warnings and instructions may result in electric
shock, fire and/or serious injury.
Save all warnings and instructions for future reference.
9
English (Original Instructions)
EN
Loading ...
Loading ...
Loading ...