Loading ...
Loading ...
Loading ...
Important: Study and follow the diagram carefully.
a. Feed the bolt end of the 2700mm Upper cable (49) up through opening in Upper frame (2). Insert Ø22
x 15mm Pulley bushings (63) into holes and attach 1st Pulley (71) using M10 x 60mm Allen bolt (29)
and M10 Aircraft nut (42).
b. Repeat procedure for 2nd Pulley, feeding cable up through opening in Upper frame (1).
c. Attach 3rd Pulley to Upper frame (2) using a M10 x 42mm Allen bolt (31), 2 x Ø10mm Washers (41)
,
M10 Aircraft nut (42) and 1 x L-Shaped separation blade (22).
d. Place 4th Pulley (71) onto the cable and fit Pulley covers (46) over Pulley and cable. Attach Pulle
y
assembly to Floating pulley bracket (10) using a M10 x 40mm Allen bolt (32), 2 x Ø10mm Washers (41)
and M10 Aircraft nut (42).
Step 12
Assembly instructions
20
31
Loading ...
Loading ...
Loading ...