Loading ...
Loading ...
Loading ...
- 4 -
n Unthread BONNET NUT (3).
n Remove TEST CAP (1) and install FLUSH PLUG (2).
n Rotate FLUSH PLUG (2) so opening for inlet (HOT or COLD) directs water ow to selected outlet (SHOWER or TUB).
n Secure FLUSH PLUG (2) by tightening BONNET NUT (3).
n Check for leaks and ush lines.
n Repeat steps above to Test/Flush alternate ow paths.
n Upon completion, unthread BONNET NUT (3). Remove FLUSH PLUG (2), replace with TEST CAP (1), and tighten
BONNET NUT (3).
TEST PROCEDURES FOR FLUSH PLUG (SOLD SEPARATELY)
3
M965906 (5/18)
2
1
3
Loading ...