Loading ...
Loading ...
Loading ...
6
9. DUCT CONNECTION
VERTICALLY DUCTED INSTALLATION:
Plug hood power cord into the outlet. Slide a 6” round metal duct section over the
adapter/damper on the hood. Use metal foil duct tape to seal the joint.
HJ0157
HORIZONTALLY DUCTED INSTALLATION:
Plug hood power cord into the outlet. Measure and install 6” round metal ductwork to wall
cap and 90° elbow over duct collar over the adapter/damper on the hood. Use metal foil
duct tape to seal the joints.
HJ0159
14¼”
MAX.
LOWER FLUE
MOUNTING
BRACKET
HD1033A
NOTE: To make sure there will be adequate clearance between top of hood and lower
flue mounting bracket for ductwork, elbow must be located below the lower flue
mounting bracket.
Loading ...
Loading ...
Loading ...