Hoshizaki FD650MRJZC FD-650MRJZ-C 22" Slim-Line Dispenser Series Remote Cool Modular Ice Machine

Instruction Manual - Page 39

For FD650MRJZC.

PDF File Manual, 51 pages, Read Online | Download pdf file

FD650MRJZC photo
Loading ...
Loading ...
Loading ...
39
2. Mechanical Backup Bin Control Check
1) Make sure the power switch is in the "OFF" position and that the power supply is off.
2) If not removed, remove the top panel.
3) Remove the spout-to-chute strap connecting the spout to the chute assembly, then
remove the spout-to-chute packing, spout-to-chute bracket (if applicable), and drip
guide (if applicable). See Fig. 17. Pull up the chute assembly slightly so that you can
access the actuator located in the top of the chute.
4) Turn on the power supply. Make sure the control switch is in the "ICE" position, then
move the power switch to the "ON" position.
5) 30 seconds after the upper ๎˜žoat switch closes, the control board "GM" LED turns on.
After "GM" LED turns on, press the "SERVICE" button on the control board to bypass
the 5-minute compressor delay. WARNING! Risk of electric shock. Care should be
taken not to touch live terminals.
6) "GM" LED and "COMP" LED are on. Press and hold the actuator located in the top of
the chute assembly. "GM" LED and "COMP" LED turn off within 10 seconds and the
control board sounds a 9 beep alarm. Release the actuator.
7) Move the power switch to the "OFF" position, then turn off the power supply.
Note: The control board alarm resets when power is turned off.
8) Replace the chute assembly and reconnect the spout-to-chute assembly with the
spout-to-chute strap. Be sure the drip guide (if applicable), spout-to-chute bracket
(if applicable), spout-to-chute packing, and spout-to-chute strap are in their correct
positions.
9) Replace the control box cover and top panel in their correct positions.
10) Turn on the power supply. Make sure the control switch is in the "ICE" position, then
move the power switch to the "ON" position to start the automatic icemaking process.
11) Replace the front panel in its correct position.
12) Return to "II.I.2. Post-Startup" and complete ๎˜Ÿnal checklist.
Fig. 17
Chute Assembly
Actuator
Spout
Proximity Switch (mechanical bin control)
Model Shown: F-1002MRJ-C
Spout to Chute
Packing
Control Board
Spout-to-Chute Strap
Spout-to-Chute
Strap
Spout-to-Chute Bracket
Loading ...
Loading ...
Loading ...