Hoshizaki FD650MRJZC FD-650MRJZ-C 22" Slim-Line Dispenser Series Remote Cool Modular Ice Machine

Instruction Manual - Page 36

For FD650MRJZC.

PDF File Manual, 51 pages, Read Online | Download pdf file

FD650MRJZC photo
Loading ...
Loading ...
Loading ...
36
J. Startup
WARNING
All parts are factory-adjusted. Improper adjustments may adversely affect safety,
performance, component life, and warranty coverage.
NOTICE
• If the appliance is turned off, wait for at least 3 minutes before restarting the
appliance to prevent damage to the compressor.
At startup, conrm that all internal and external connections are free of leaks.
Additional Notice for Remote Models
The appliance must have power for a minimum of 4hours prior to startup to
prevent compressor damage.
1) Open the water supply line shut-off valve(s).
2) Remove the front panel.
3) Move the control switch on the control box to the "ICE" position, then move the power
switch to the "ON" position.
4) Replace the front panel in its correct position.
5) Turn on the power supply to start the automatic icemaking process.
6) Once the unit starts to produce ice, allow it to run for another 30 minutes.
On water-cooled models, conrm proper condenser drain outlet/return outlet
temperature as outlined in "II.F.2. Water-Cooled Condenser." On low-side rack system
models, if not utilizing R-404A, conrm proper EPR valve setting as outlined in "II.H.1.
Line Set Size and Rack System Requirements."
7) Turn off the power supply, then remove the front panel.
8) Move the control switch to the "DRAIN" position, then replace the front panel in its
correct position. Turn on the power supply and allow the water system to drain for
5 minutes.
9) Remove the front panel.
10) Move the power switch to the "OFF" position, then turn off the power supply.
11) Pour warm water into the dispenser unit/ice storage bin and melt any remaining ice.
Clean the dispenser unit/ice storage bin liner using a neutral cleaner. Rinse thoroughly
after cleaning.
12) Conrm bin control operation. See "II.K. Bin Control Check."
13) After conrming bin control operation, return to "II.I.2. Post-Startup" and complete nal
checklist.
Loading ...
Loading ...
Loading ...