Kolpak KF8-0806-CR Kold-Front Walk-In Cooler 8'-6.25" H, 7'-9" W, 5'-10" L with Era floor

Refrigeration installation operation - Page 4

For KF8-0806-CR.

PDF File Manual, 84 pages, Read Online | Download pdf file

KF8-0806-CR photo
Loading ...
Loading ...
Loading ...
www.welbilt.com 800-225-9916 4
Receiving Inspection
Check the shipment carefully and compare to the bill of lading. Account for all items
listed and inspect each container for damage. Carefully inspect for any concealed
damage. Report any shortages or damages to the carrier, note on the bill of lading, and
file a freight claim.
Damaged material cannot be returned to the manufacturer without prior approval. A
Return Material Authorization (RMA) must be obtained. Contact a sales representative
at 800-826-7036.
Locating and Mounting Condensing Unit
General Guidelines:
Check the selected installation location to ensure that racks, braces, flooring,
foundations, etc. are adequate to support the condensing unit weight.
The installation location is clean, dry, and level.
Locate away from corrosive and noise sensitive atmospheres.
Use the condensing unit skid and base when moving the unit. Do not remove
unit from skid until the unit is moved to the mounting location.
Mount the condensing unit base to pads or structural rails using properly sized
bolts through the unit base. Center of condensing unit needs to be properly
supported.
Loading ...
Loading ...
Loading ...