Maytag MBR1956KES 18.6 cu. ft. Bottom-Freezer Refrigerator with Electronic Dual Cool System and Spill Catcher Shelves

Use & Care Guide - Page 10

For MBR1956KES.

PDF File Manual, 104 pages, Read Online | Download pdf file

MBR1956KES photo
Loading ...
Loading ...
Loading ...
9
Connecting the Water Supply
(select models)
To reduce the risk of injury or death, follow
basic precautions, including the following:
Read all instructions before installing ice maker.
Do not attempt installation if instructions are not
understood or if they are beyond personal skill
level.
Observe all local codes and ordinances.
Do not service ice maker unless specifically
recommended in Use & Care Guide or published
user-repair instructions.
Disconnect power to refrigerator
before installing
ice maker.
Water damage due to an improper water
connection may c
ause mold/mildew growth.
Clean up spills or leakage immediately.
WARNING
To avoid property damage or possible injury,
follow basic pr
ecautions, including the
following:
Consult a plumber to connect
1
4 O.D. copper
tubing to household plumbing to assure
compliance with local codes and ordinances.
Confirm water pressure to water valve is between
35 and 100 pounds per square inch. 20 pounds
per square inch if there is not a water filter
.
Do not use a self-piercing, or
3
16 saddle valve.
Both reduce water flow and can become clogged
over time, and may cause leaks if repair is
attempted.
Tighten nuts by hand to prevent cross threading.
Finish tightening nut
s with pliers and wrenche
s.
Do not over-tighten.
Wait 2-3 hours
before placing refrigerator into final
position to check and correct any water leaks.
Recheck for leaks after 24 hours.
Verify the copper tubing under the sleeve is
smooth and free from defects.
Do not reuse an
old sleeve.
CAUTION
Installation
M
aterials Needed:
1
4 outer diameter flexible copper tubing
Shut-off valve (requires a
1
4 hole to be drilled into
water supply line before valve attachment)
Adjustable wrench (2)
1
4 hex nut driver
Notes:
Use copper tubing only for installation. Plastic is
less durable and can cause damage.
Add 8’ to tubing length needed to reach water
supply for creation of service loop.
1. Create service loop with
copper tubing (minimum 2’
diameter). Avoid kinks in the
copper tubing when
bending the service loop.
Do
not use plastic tubing.
2. Remove plastic c
ap from water valve
inlet port.
3. Place brass nut
(A) and sleeve (B)
on copper tube end as illustrated.
Reminder: Do not use an old
sleeve. The nut and sleeve are
provided in the Use and Care
packet.
4.
Place end of copper tubing into
water valve inlet por
t. Shape
tubing slightly.
Do not kink – so
that tubing feeds straight into inlet
port.
2’ diameter
minimum
A
B
A
B
Loading ...
Loading ...
Loading ...