Furrion FACT12CA-PS ROOFTOP AIR CONDITIONER WITH ELECTRONIC CONTROL

User Manual - Page 6

For FACT12CA-PS. Also, The document are for others Furrion models: FACR13SA-**, FACR14SA-**, FACR15SA-** FACR13SA-**-AM, FACR14SA-**-AM, FACR15SA-**-AM, FACT12CA-**, FACT12CA-**-OEM

PDF File Manual, 44 pages, Read Online | Download pdf file

FACT12CA-PS photo
Loading ...
Loading ...
Loading ...
3⁄4" Min.
(19.05 mm)
Leave access for
power supply wiring
Air Distribution Duct Sizing and Design
The installer of this system must design the air distribution
system for their particular application.
NOTE: Make sure ductwork will NOT bend or collapse during
and after installation, and that it is correctly insulated and
sealed. Otherwise, damage to roof structure and ceiling could
occur.
The following requirements must be met for properly operate
the unit:
Roof Cavity Depth 3.5"-6" (89mm-152mm)
Duct Cross
Sectional Area
21 Sq. In. Min.
Duct Size
Depth
1½" Min. - 2½" Max. (38mm
Min. - 63.5mm Max.)
Width
7" Min. - 10" Max. (178mm
Min. - 254mm Max.)
Total Duct Length
15Ft. Min. - 40Ft. Max. (4.5m
- 13m)
Duct Length (short run) 1/3 Total Duct Length
Register
Requirements per
A/C Unit
Number Required 4 Min. - 8 Max.
Supply Register Free
Air Area
14 Sq. In. (90 sq. cm)
Return Register Free
Air Area
40 Sq. In. (258 sq. cm)
Distance From Duct
End
5" Min. - 8" Max. (127mm
Min. - 203mm Max.)
Distance From Elbow 15" (381mm)
Total System Static
Air Pressure
Blower at High Speed,
Filter & Grille In Place
0.55 - 1.10 In. W.C.
Properly insulate and seal all discharge air ducts to prevent
condensation from forming on their surfaces or adjacent
surfaces during operation of the unit. This insulation must
be R-7 minimum.
Frame
DuctDuct
Frame
Frame
Roof
Opening
Roof Opening
Roof
Duct
Ceiling
Duct
TOP VIEW (BACK OF RV)
SIDE VIEW (TOWARD BACK OF RV)
Return air openings must have 80 square inches (516
square centimeters) minimum free area including the filter.
Return air to the unit must be filtered to prevent dirt
accumulation on the unit cooling surface.
Air Distribution System Installation
It is the responsibility of the installer to review each RV floor
plan to determine the following items in conjunction with “Air
Distribution Duct Sizing and Design” section
NOTE: Alternate configurations and methods may be used
which will allow the unit to operate properly, however, these
alternate configurations and methods MUST be approved by
Furrion in writing.
Duct size
Duct layout
Register size
Register location
Thermostat location
Indoor temperature sensor location (if applicable)
Front
Registers 4
Min - 8 Max.
(Per Unit) 14
Sq. In. Free
Area Per
Register
Air Conditioner
Return Air
Preparing Wire Connections
Each rooftop air conditioner opening must be prepared
with proper wiring to connect the ceiling controller of the air
conditioner to the 115VAC and 12VDC supply voltage, wall
thermostat and furnace switch.
NOTE: The wire connections need to be positioned in the
forward facing 1/4 section of the opening.
DANGER
Electrical Shock Hazard
Disconnect power before servicing. Failure to obey this
warning could result in death or serious injury.
Provide grounding in compliance with all applicable
electrical codes. Failure to obey this warning could result
in death or serious injury.
115VAC Supply
1. Prepare a dedicated 20 amp rated circuit for each air
conditioner unit, protected with a time delay fuse or circuit
breaker.
NOTE: With multiple air conditioners on a 50 amp service,
it is best to balance between the line voltage legs.
2. Extend circuit with a 12AWG 2-wire with ground to the roof
opening.
NOTE: The wire gauge is generally acceptable per NEC
code, refer to rooftop unit nameplate and applicable code
for proper sizing.
3. Protect the wire where it passes through any rough
English
CCD-0005730 Rev: 04-25-22
- 5 -
Loading ...
Loading ...
Loading ...