JET JIW-45T , 45-Ton Ironworker, 1Ph 115V

Manual - Page 13

For JIW-45T.

PDF File Manual, 32 pages, Download pdf file

Loading ...
Loading ...
Loading ...
13
12.
Install the punch into the punch nut.
13.
Place the square key (Fig. 7, F) into the groove
on the top of the punch and engage the punch
and key assembly into the groove on the punch
ram (Fig. 7, G).
14.
Hold the punch and key in position and secure
with the punch nut. Verify that the key has
remained in place and firmly tighten the punch
nut. Do not overtighten.
15.
Install the strippers onto the punch block and
tighten in place. (Fig. 4, A)
16.
Start hydraulics and slowly, using a press and
release of the foot pedal, lower the punch into
the die to verify the punch enters the die with
clearance around the total perimeter. DO NOT
allow the punch to contact the die in any way.
Should contact occur, verify that the correct
punch and die are matched together or that the
punch and die are aligned. Square and Oblong
set especially.
17.
Once the punch and die have been verified in
alignment and secured, the ironworker may be
returned to service.
8.2 Center station change
Referring to Figures 8 - 11:
Tools required for assembly:
5/8” open-end wrench
3/4” open-end wrench
9/16” socket wrench with extension
The center station is fitted with the flat/angle shear
station as standard. An optional punch station may
be installed in place of the shear station.
This procedure will require the
ironworker to be powered on to change the
position of the rocker arm. ALWAYS disconnect
power to the machine before performing the
steps when the rocker arm is to be stationary.
Failure to do this may result in serious personal
injury.
1.
The cylinder should be in the retracted position.
If not, power the ironworker On and press the
cylinder retract pedal to fully retract the cylinder.
2.
Disconnect the ironworker from the power
supply.
3.
Remove the blade to rock arm pivot bolt (Fig. 8,
A).
4.
Remove and retain the four bolts (Fig. 8, B)
mounting the shear station to the frame table.
5.
Power the ironworker On and press the cylinder
extend pedal to raise the rocker arm away from
the shear blade.
6.
Disconnect the ironworker from the power
supply.
Figure 8
7.
Remove and store the shear station until
needed again.
Figure 9
8.
Place the punch table and the punch block on
the frame table. Allow the punch to engage the
die and assist in alignment. It is recommended
to use the 1" punch and die set. (Fig. 9, C)
9.
Install the four hex head screws using the 9/16"
socket wrench with extension to install and
tighten the cap screws. (Fig. 9, D)
Figure 10
Loading ...
Loading ...
Loading ...