Zip MT2790Z8-91295 HydroTap Celsius All-in-One Arc Boiling Chilled and Sparkling Filtered Water

Installation Instruction - Page 11

For MT2790Z8-91295.

PDF File Manual, 20 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
803341 - Tap Installation Instructions - 02.17 - v2.02 Page 11 of 20
4.5
Installation Instructions
CLAMP
BLOCK
Screw the braided hoses
into the extension tubes.
Ensure the o-rings
are lubricated prior to
assembly and that the
braided hoses, with
coloured markings,
are correctly matched
with the colours on the
extension tubes and
on the clamp block (as
indicated).
Make sure all tubes and
hoses are firmly secured.
Braided
hoses
Vented braided hose positions
Mains braided hose positions
BLUE to
Mixer IN
HOT IN
from HWS
WHITE
Mains IN
RED from
Mixer OUT
Underside view
BLUE
Mains IN
RED
Extension
tubes
Typical Vented assembly
External HOT & COLD
isolation valves
(Not supplied)
Tee piece
(Supplied)
Typical All-in-1 Mains Installation (see section 5)
4.6
Note:
Note:
All silicon tubes must
All silicon tubes must
be cut to size. They must have a
be cut to size. They must have a
constant fall back to the unit.
constant fall back to the unit.
RED Hot
BLUE Chilled
Note:
- Mains hose
length is 750mm
- Plug and Cord
length is 1800mm
Position the under
sink unit close
to the outlet tap,
within reach of
the hose and cord
lengths supplied
Loading ...
Loading ...
Loading ...