Loading ...
Loading ...
Loading ...
English 17
Installation
Step-by-step installation
STEP 1 Select a site
Site requirements:
• Solid, level surface without carpeting or ooring that may obstruct ventilation
• Away from direct sunlight
• Adequate room for opening and closing the door
• Away from a heat source
• Room for maintenance and servicing
• Temperature range: between 50 °F (10 °C) and 109 °F (43 °C)
Clearance
See the following gures and tables for space requirements for installation.
A
B
C
D
Model RS23CB7***** RS28CB7*****
Depth "A"
28 13/16"
(732 mm)
33 3/4"
(857 mm)
Width “B” 35 7/8" (912 mm)
Height “C” 68 5/8" (1744 mm)
Overall
Height “D”
70 1/8" (1782 mm)
Untitled-2 17 2022-11-29 10:50:52
Loading ...
Loading ...
Loading ...