Cooper&Hunter CH-12MCT1W-230VI - Cooling and Heating Solutions

User Manual - Page 24

For CH-12MCT1W-230VI.

PDF File Manual, 52 pages, Download pdf file

Loading ...
Loading ...
Loading ...
2. Install the indoor air handler
Indoor Unit
Installation
After you selecting an installation location, drill
a hole with the diameter of 6mm or less into
the roof beam based on the layout of the
installation board (accessory
Installation
cardboard template
). After drilling the hole,
remove the installation board.
NOTICE
NOTICE
After you have nished installing the main body,
when choosing where to start, determine the
direction of the pipes to be drawn out.
Especially in cases where there is a ceiling involved,
align the refrigerant pipes, drain pipes, and indoor
and outdoor lines with their connection points
before mounting the unit.
Page 24
Installation cardboard template
Connect the wire to the terminal according to
the wire connecting diagram.
Select one to
connect ground
wire
Fix the wire with the clip by using the two screws.
Install the terminal cover by xing the two screws.
Two screws
1
2
3
TO OUTDOOR UNIT
TO INDOOR UNIT MAIN BOARD 16.93’’
(430mm)
51.18’’(1300mm)
CUTTING LINE
Loading ...
Loading ...
Loading ...