Tripp Lite SR4POST25 25U SmartRack 4-Post Open Frame Rack - Organize and Secure Network Rack Equipment

Quick Assembly Guide - Page 5

For SR4POST25. Also, The document are for others Tripp Lite models: SR4POST, SR4POST1224, SR4POST13

PDF File Manual, 8 pages, Read Online | Download pdf file

SR4POST25 photo
Loading ...
Loading ...
Loading ...
2-6
2-7
K
I
A
A
F
F
G
F
D
E
D
K
I
D
C
C
C
C
A
A
2-8
C
B
K
K
I
I
D
E
D
C
C
B
D
D
5
2 – Rack Assembly continued
2-6
Fasten a left vertical rail
A
and assembled
bottom section
D
/
E
/
D
to the base bracket
C
with two M8 acorn/cap nuts
I
and M8 washers
K
. Tighten 90%. (The threaded M8 studs at the
end of the assembled bottom section should
pass through the vertical rail first, then the base
bracket.)
2-7
Fasten an assembled top section
F
/
G
/
F
to
the top bracket
C
and left vertical rail
A
with
an M8 acorn/cap nut
I
and M8 washer
K
.
Tighten 90%. (The threaded M8 stud at the
end of the assembled top section should
pass through the vertical rail first, then the
top bracket.)
2-8
Fasten a base bracket
C
and right vertical rail
B
to the threaded M8 studs at the end of the
assembled bottom section
D
/
E
/
D
with two
M8 acorn/cap nuts
I
and M8 washers
K
. Also
fasten the base bracket to the threaded M8 studs
at the end of the other assembled bottom section
with two M8 acorn/cap nuts
I
and M8 washers
K
.Tighten 90%. (The threaded M8 studs should
pass through the vertical rails first, then the base
bracket.)
Loading ...
Loading ...
Loading ...