Tripp Lite SR4POST25 25U SmartRack 4-Post Open Frame Rack - Organize and Secure Network Rack Equipment

Quick Assembly Guide - Page 4

For SR4POST25. Also, The document are for others Tripp Lite models: SR4POST, SR4POST1224, SR4POST13

PDF File Manual, 8 pages, Read Online | Download pdf file

SR4POST25 photo
Loading ...
Loading ...
Loading ...
2-3
2-4
2-5
A
D
F
E
G
D
C
F
B
C
K
K
I
I
H
H
4
2 – Rack Assembly continued
2-3
Lay out a left vertical rail
A
, right vertical rail
B
,
assembled top section
F
/
G
/
F
and assembled
bottom section
D
/
E
/
D
in a rectangle on the
floor or a stable work surface. Place all the
pieces facedown. The assembled top and
bottom sections are facedown when the inserted
bolt heads are facedown. The vertical rails are
facedown when the rails are laying flat on the
side that has keyhole mounting slots. Insert the
threaded M8 studs at the ends of the top and
bottom sections through the corresponding holes
in the vertical rails, but do not fasten yet.
2-4
Fasten a base bracket
C
to the threaded M8
studs at the end of the assembled bottom section
with two M8 acorn/cap nuts
I
and M8 washers
K
. Tighten 90%. (The threaded M8 studs should
pass through the vertical rail first, then the base
bracket.)
2-5
Fasten a top bracket
H
to the threaded M8 stud
at the end of the assembled top section with an
M8 acorn/cap nut
I
and M8 washer
K
. Tighten
90%. (The threaded M8 stud should pass through
the vertical rail first, then the top bracket.)
Loading ...
Loading ...
Loading ...