Kobe RA02 SQB-5 Range Hood

INSTALLATION INSTRUCTIONS AND OPERATION MANUAL - Page 9

For RA02 SQB-5. Series: Deluxe Series, RA02 Series
Also, The document are for others Kobe models: RA0230SQB-DC-5, RA0230SQB-DC24-5, RA0230SQB-DC48-5, RA0236SQB-DC-5, RA0236SQB-DC24-5, RA0236SQB-DC48-5, RA0242SQB-DC-5, RA0242SQB-DC24-5, RA0242SQB-DC48-5, RA0248SQB-DC-5, RA0248SQB-DC24-5, RA0248SQB-DC48-5

PDF File Manual, 24 pages, Read Online | Download pdf file

RA02 SQB-5 photo
Loading ...
Loading ...
Loading ...
6
Hood Installation
CAUTION: If required to move the cooking
range to install the hood, turn off the power
on an electric range at the main electrical
box. SHUT OFF THE GAS BEFORE
MOVING A GAS RANGE.
1. Using references in Table 2 and measurements
on Page 23, mark the leveling locations point for
hood-mounting bracket on the wall.
2. Secure two mounting screws (provided) to the
wall, leaving an 1/8” space from the wall.
3. Align the hood-mounting bracket to the
mounting screws on the wall and hang hood into
place.
4. Secure and tighten the mounting screws.
CAUTION: MAKE SURE HOOD IS SECURE
BEFORE RELEASING.
Wiring to Power Supply
SAFETY WARNING
RISK OF ELECTRICAL SHOCK. THIS RANGE
HOOD MUST BE PROPERLY GROUNDED.
MAKE SURE THIS IS DONE BY SPECIALIZED
ELECTRICIAN IN ACCORDANCE WITH ALL
APPLICABLE NATIONAL AND LOCAL
ELECTRICAL CODES. BEFORE CONNECTING
WIRES, SWITCH POWER OFF AT SERVICE
PANEL AND LOCK SERVICE PANEL TO
PREVENT
POWER FROM BEING SWITCHED ON
ACCIDENTALLY.
5. Connect the electrical wires.
-
Connect three wires (black, white and green)
to house wires and cap with wire connectors.
Connect according to color: black to black,
white to white, and green to green as shown
on Figure 4.
-
If necessary to hide the electrical wire
connections, push wires back into the wiring
box. Access the wire connections
underneath the hood. To prevent any
damage, make sure wires do not slip
between motor or any moving parts.
Figure 4
Figure 5
Figure 6
Loading ...
Loading ...
Loading ...