Kobe RA02 SQB-5 Range Hood

INSTALLATION INSTRUCTIONS AND OPERATION MANUAL - Page 10

For RA02 SQB-5. Series: Deluxe Series, RA02 Series
Also, The document are for others Kobe models: RA0230SQB-DC-5, RA0230SQB-DC24-5, RA0230SQB-DC48-5, RA0236SQB-DC-5, RA0236SQB-DC24-5, RA0236SQB-DC48-5, RA0242SQB-DC-5, RA0242SQB-DC24-5, RA0242SQB-DC48-5, RA0248SQB-DC-5, RA0248SQB-DC24-5, RA0248SQB-DC48-5

PDF File Manual, 24 pages, Read Online | Download pdf file

RA02 SQB-5 photo
Loading ...
Loading ...
Loading ...
7
Duct Cover Installation
6. Use 6” round steel pipe for 30” and 36” models
or 8” round steel pipe for 42” and 48” models
(follow building codes in your area) to connect
the exhaust on the hood to the ductwork above.
Use duct tape to make all joints secure and air
tight. Refer Figure 5.
7. Use four 4mm x 8mm screws (included) to attach
duct cover to hood. Refer to Figure 6.
Install Accessories
8. Attach oil tunnel. Refer to Figure 7.
9. Refer to Figure 23. Slide the baffle filter into
the hood. Push the baffle filter upward.
Slide forward. Pull downward. Fit into
place.
10. Repeat until all baffle filters and spacers are
resting against oil tunnel. Refer to page 8.
Final Assembly
11. Turn power ON in control panel. Check all lights
and fan operation.
12. Make sure to leave this manual for the
homeowner.
Figure 7
Figure 8
Loading ...
Loading ...
Loading ...