DCS RF15IL2 15 Inch Stainless Steel Freestanding and Built-In Ice Maker

User Manual - Page 23

For RF15IL2.

PDF File Manual, 30 pages, Read Online | Download pdf file

RF15IL2 photo
Loading ...
Loading ...
Loading ...
23
Clean the Ice Machine
Cleaning the ice machine will help prevent mold and
mildew growth as well as sanitize the ice machine for
storage or when it is put back into service. See page 17 for
instructions for cleaning the ice machine.
Draining and Removing Water from the Ice-
Making System with a Gravity Drain.
1. Turn o󰀨 the water supply to the ice machine.
2.
3.
Disconnect the water supply fitting at the inlet of the
water valve. (See Figure 29a).
Change the electronic control to the "CLEAN" position
for approximately one (1) minute. This will energize and
open the water valve and remove most of the water
from the water valve and the water valve’s outlet water
line to the reservoir.
4. Change the electronic control to the "OFF" position.
This will energize and open the drain valve to drain the
reservoir and the ice machine drain system.
5. Unplug the ice machine from the electrical outlet.
6. Remove the access cover from the rear of the ice
machine. (See Figure 30).
PREPARING THE ICE MACHINE FOR STORAGE
If the ice machine is moved, not used for an extended
period of time, or will be in an area that will be near freezing
temperatures, it is necessary to remove any remaining
water in the ice-making system.
This ice machine must have all water drained and removed
to prevent ice machine damage as well as possible water
damage to the surrounding area in freezing conditions.
These damages are not covered under warranty.
Do not use any type of anti-freeze or other solution as a
substitution for properly draining the ice machine.
!
CAUTION
!
CAUTION
Risk of electrical shock or personal injury could occur
due to moving components, if machine compartment
access cover is removed before unplugging the ice
machine.
!
WARNING
Electrocution Hazard
Figure 29
Back view of
ice machine
Water supply
tting
Water
supply
line
Water valve
inlet
Access
cover
Screw
Figure 29a
Figure 30
!
CAUTION
Winterization: If the unit will be exposed to temperatures
of 40°F (5°C) or less, these steps must be followed.
Loading ...
Loading ...
Loading ...