GE - General Electric GXRQ18NBN GE Reverse Osmosis Filtration System

User Manual - Page 15

For GXRQ18NBN.

PDF File Manual, 28 pages, Download pdf file

Loading ...
Loading ...
Loading ...
15
Installation Instructions
INSTALATION INSTRUCTIONS
POWER UP THE FAUCET TIMER
1. On the faucet handle, locate the battery cover.
There should be a thin plastic strip that sticks
out from the battery cover.
2. Grasp the plastic strip, pull it all the way out and
discard it.
3. The LED on the faucet handle will briefly flash
red, then blue, to indicate the 6 month timer is
powered up.
FAUCET ELECTRONICS
Inside the faucet handle is a battery operated 6 month timer. On a new Reverse Osmosis system, the product water
faucet is shipped with a battery in the holder. After the faucet has been installed, the thin plastic strip must be
removed, as described below, to power up the 6 month timer.
The faucet LED will light blue for a few seconds whenever the faucet handle is operated. When 90% of the filter
lifetime has elapsed, the LED will flash blue 3 times whenever the faucet handle is operated. It will flash red
continuously when 100% (6 months) has elapsed, to indicate that the prefilter and postfilter cartridges must be
changed.
Always change the battery, as shown on page 21, when replacing the prefilter / postfilter cartridges (every 6 months).
Faucet
Handle
Plastic Strip -
pull out and
discard
Battery
Cover
Loading ...
Loading ...
Loading ...