Zephyr AK8000BS

User Manual - Page 12

For AK8000BS.

PDF File Manual, 44 pages, Download pdf file

Loading ...
Loading ...
Loading ...
10
www.zephyronline.com
Installation – Installing the Power Pack
1. Install optional AK08xxAS Stainless Steel Liner. Review
manual included with liner for more details.
2. If no liner is used cut out an opening in the bottom of the
cabinet by following the dimensions in FIG 1.
3. Lift Power Pack into opening and ensure locking clip has
ORFNHGLQWRSRVLWLRQORFNLQJFOLSLVORFDWHGRQOHIWVLGHRI
Power Pack. FIG 2
)DVWHQ0VFUHZVLQWRHDFKORQJVLGHRI3RZHU3DFN
If a liner is used the screws will go through the Power Pack
mounting holes, then the liner and into the wood base.
note: Wood blocking may need to be added to cabinet
base if additional support is needed. see FIG 3 and FIG 4
5. Install duct work and seal with duct tape.
7. Install electrical.
8. Remove all packing materials before using Power
Pack. Switch power on and check for leaks around duct
tape.
,QVWDOO¿OWHU
The ducting from this fan to the outside of the building has a strong
HIIHFWRQWKHDLUÀRZQRLVHDQGHQHUJ\XVHRIWKHIDQ8VHWKHVKRUWHVW
straightest duct routing possible for best performance, and avoid
installing the fan with smaller ducts than recommended. Insulation
around the ducts can reduce energy loss and inhibit mold growth. Fans
LQVWDOOHGZLWKH[LVWLQJGXFWVPD\QRWDFKLHYHWKHLUUDWHGDLUÀRZ
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
Ductwork
wood base
wood base
2” minimum
secure (2) M4 screws to mounting
holes on each long side of Power Pack
metal or other non
combustible material
D
uctwor
k
wood base
woo
d
b
ase
2
” minimum
FIG 1
FIG 2
FIG 3
FIG 4
locking clip
mounting holes
controls
front view
right side view
Ductwork
cabinet bottom cut-out size
26
7/8
10
5/8
Power Pack
Stainless Steel Liner
C/L
C/L
Loading ...
Loading ...
Loading ...