AmazonCommercial AB-P106

User Manual - Page 10

For AB-P106.

PDF File Manual, 48 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
10
WARNING
The pump must be filled with water before operation. Running the
pump dry will cause damage to the shaft seal and will void the warranty.
D
E
NOTICE
If discharge tee is connected, remove the prime plug (G), Fill water into top
of pump outlet (E) until pump overflows with water. Reinstall the prime plug (G) If no
discharge tee is installed fill water into top of pump outlet (E) until pump overflows with
water. when finished priming.
NOTICE
Usage: You can install a 100# pressure gauge (sold separately) on top of the discharge
tee cap in order to monitor pressure.
Do not run the pump with the outlet pipe or hose nozzle closed. This will
cause damage to the pump, or burst the hose from excessive pressure. This could result
in death or serious injury. Use only reinforced high-pressure hoses or pipes for the outlet
connection or pipes for the inlet (suction) connection.
Never remove the ground prong on the power cord. Never hardwire the power cord.
Cutting the cord, hardwiring, or removing the ground prong can result in death or serious
injury and will void the warranty
Operation
Step 1: Priming the Pump
1
G
Loading ...
Loading ...
Loading ...