Loading ...
Loading ...
Loading ...
FINAL INSTALLATION
(CONT.)
PROPER AIR CIRCULATION (KRP) PROPER AIR CIRCULATION (KRP)
TESTING AND INITIAL START UP
PRETEST CHECKLISTPRETEST CHECKLIST
; Check that the connection to the water system does not have any leaks and that the valve
is easily accessible.
; Check that the electrical connection is correctly installed and that the circuit breaker is
identified/marked for later use.
; Check that the unit is level and aligns with adjacent cabinets.
; Check that the anti-tip brackets are secure, and the side connectors are secure with trim in
place.
; Check that all adhesive tape and external or internal temporary protective packaging have
been removed.
; Check the perfect closing of the doors and the smooth sliding of the drawers and shelves.
; If the unit has an icemaker, make sure the water filter cartridge is installed. (Unless filtered
water is being provided to the unit.)
For KRP models, ventilation is provided by a forced air system through a grille in the
top of the refrigerator. This open space in the grille must not be restricted by any
cover or device that would reduce the proper airflow, as it would reduce product
efficiency and increase energy consumption. A vent must be provided at the rear
for the air to exit. See page 5 for location and dimensions.
© 2020 Hestan Commercial Corporation
36
EN
Loading ...
Loading ...
Loading ...