GE AZ75W12DACM1 Zoneline 12,000 BTU Package Vertical Air Conditioner with Electric Resistance Heat

Owner's Manual and Installation Instructions - Page 18

For AZ75W12DACM1. Series: 7500 Series

PDF File Manual, 28 pages, Read Online | Download pdf file

AZ75W12DACM1 photo
Loading ...
Loading ...
Loading ...
Installation Instructions
WALL PLENUM AND ARCHITECTURAL LOUVER INSTALLATION
Install the appropriate wall plentma through the exterior wall in accordance with the Installation Instructions
provided with the plenum.
IMPORTANT: The wall plenum is not designed to carry structural loads.
Proper wall header construction is required. The plenum requires proper
flashing, shim and caulk for a weather resistant installation.
Proper header for
stru(tu ral support.
Apply proper (mdking
and fl_lshing.
Prop( fly square and
level plenum.
Architectural
Louver--RAVAL1
Exterior/OutsideWall
Wall Plenum
RAVWP6- 6"D x 19a¼"Wx32"H
RAVWP8- 8"D x 19aA"Wx32"H
RAVWP12- 12"Dx 19Vd'Wx 32"H
RAVWP15- 15"Dx 19Y¢"Wx32"H
Case
[] BUILD AND INSTALL THE
ZONELINE BASE PLATFORM
(,o sr ( r ; 2 _/_ n . x 2_)V_*'rain. square platfbrm.
NOTE: The platform must haxe a load-b(aring
capa(ily ot 175 lbs. mininaum.
2 ._j
access t4J
fordram Cutoutfor drain
n
2. Place lh( platform in the utilily closet with the
[bllowing clearance between it and lh( inlerior
surfhce of the walls/door/pan(l:
4" rain. fi-om flont of the case - Unit to be
installed through FRONT ot case
5" rain. fi-om flont of the case - [ 7nit to be
installed through SIDE of case
3" rain. fi-om two sides o_ the case
3, Align the platform with lh( op(ning of
the wall plenum an(1 s(cure to rile floor
using appropriate brack(ts and bohs.
18
Loading ...
Loading ...
Loading ...