GE - General Electric GE20L08BAR GE 18 Gallon Side Port Lowboy Electric Water Heater

User Manual - Page 11

For GE20L08BAR.

PDF File Manual, 66 pages, Download pdf file

Loading ...
Loading ...
Loading ...
49-6000247 Rev. 1 11
Installation Instructions
INSTALLATION INSTRUCTIONS
Component Installation
Locate the temperature and pressure relief valve, drain valve, and inlet/outlet fittings in the packaging of your water heater.
Remove and discard all gray colored plugs that were placed in the fitting openings of the water heater for shipping.
Refer to illustrations below for installing each component to the water heater.
After completing installation of all components, make sure to check all connection points for water leaks and correct if
required.
Tools needed:
• Pipe wrench
• Adjustable wrench
• Pipe joint compound or pip thread sealant tape
Install
Inlet
(Cold)
Fitting
Install
Outlet
(Hot)
Fitting
Install
Drain
Valve
Install Temperature and
Pressure Relief Valve
Loading ...
Loading ...
Loading ...