Huawei NETCOL8000-C In-room Chilled Water Smart Cooling

User Manual - Page 14

For NETCOL8000-C. Also, The document are for others Huawei models: NETCOL8000-C070, NETCOL8000-C130, NETCOL8000-C190

PDF File Manual, 20 pages, Read Online | Download pdf file

NETCOL8000-C photo
Loading ...
Loading ...
Loading ...
13
Customers can purchase Huawei's switch and NetEco for the monitoring system.
(Optional) Installing the Cap (Applicable to Upflow Units)
4.4
It takes two persons to install the cap using a 2 m step ladder.
Before installing the cap, attach the thermal insulation foam in the accessories to the top
beam of the smart cooling product, and ensure that the reserved holes in the thermal
insulation foam are aligned with the holes in the beam. Check that the cap is intact and free
from scratches, that the sheet metal is not bent, and that the screws are secure.
1. Remove the cap front panel using a
Phillips screwdriver. Place the cap on the
top of the cabinet.
2. Secure the left and right sides of the cap using six
M5 screws and the front and rear of the cap using
four M5 screws.
3. Secure the cap front panel to the
frame, and adjust the angle of the
front panel blade.
Loading ...
Loading ...
Loading ...