2.1. Installation (for grid-tie system)
Before touching any conductor surface or terminal, measure the voltage of
the contact point to conrm that there is no danger of electric shock.
After the equipment is installed, empty packaging materials such as cartons,
foam, plastic, cable ties, etc. should be removed from the equipment area.
Except for those who operate the equipment, please keep others away from
operating AC300.
The handling of any tools being used needs to be insulated and protected
from shock, or use insulated tools.
All wiring holes need to be sealed. Use re-resistant mud to seal the wiring
holes that have been routed and use the cover of the cabinet.
It is strictly forbidden to alter, damage or obscure the logo and nameplate on
the equipment.
When installing the device, please use the appropriate tools to tighten any
screws.
Live operation is strictly prohibited during installation.
Paint scratches during equipment transportation and installation must be
repaired in a timely manner. Long-term scratches are strictly prohibited and
may cause damage.
Before operation, the equipment should be secured onto a floor or other
stable objects, such as walls or possibly mounting brackets if needed.
It is prohibited to clean any electrical components inside and outside the
cabinet with water.
Do not change or modify the structure, installation sequence, etc. of the
equipment without prior authorization.
2.1.1. Personal Safety
During the operation of the equipment, if a malfunction that may cause
personal injury or equipment damage is found, it should be powered off
immediately.
DO NOT power on the device if the device has not been properly installed or
conrmed by all relevant personnel.
2.1.2. Personnel Requirements
The personnel responsible for the installation and maintenance of the
equipment must first undergo rigorous training to understand various safety