Loading ...
Loading ...
Loading ...
ASSEMBLY / PRE-OPERATION
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
The auger control rod has the short loop on the end of the
spring as shown.
1. Slide rubber sleeve up rod and hook end of spring into
control arm with loop opening up as shown,
2. With top end of rod positioned under right side of
control panel, push down on rod and insert end of rod
into hole in auger control bracket, Secure with retainer
sprinq.
i
\
CONTROL
ARM
FIG. 5
AUGER CONTROLROD AUGER
CONTROL
RETAINER LEVER
SPRING \
CONTROL
BRACKET
FIG. 6
INSTALL DISCHARGE CHUTE / CHUTE ROTATER
HEAD (See Fig. 7)
NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head,
1. Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower,
2. Positionchuterotaterheadoverchutebracket. Ifneces-
sary,rotate chute assembly toalign squareand pinon un-
derside ofchute rotate rhead with holes inchute bracket.
3. With chute rotater head and chute bracket aligned,
position chute rotater head on pin and threaded stud
of mounting bracket.
4. Install 3/8 washer and Iocknut on threaded stud and
tighten securely.
CHUTE
ROTATER
HEAD
_3/8LOCKNUT
(_)_3/8WASHER
PIN
STUD
ROTATER HEAD
CHUTE ALIGN BEFORE MOUNTING
BRACKET TIGMTENING LOCKNMT BRACKET
FIG. 7
CHECK TIRE PRESSURE
The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes. Correct and equal tire pressure
is important for best snow throwing performance.
Reduce tire pressure to 14-17 PSI (19-24,5 N-m).
Loading ...
Loading ...
Loading ...