Loading ...
Loading ...
Loading ...
9
General Electrical
The installation of the built-in electric
firebox must comply with the applicable
Local and/or National Electrical Codes
and utility requirements. (See the
unit wiring diagram at the end of this
section.) Employ qualified personnel
where required by law.
1. Allow 8" (20.3 cm) of service cable
for connecting power supply wire
to junction box on the unit when
installing and before finishing the
wall. Allow up to 4 ft (122 cm) of
service cable for connecting power
supply wire to junction box when
installing after finishing wall.
2. Wire a dedicated, properly fused
circuit with a 15 A rating for the
appropriate voltage (120 V, 240 V).
Electrical
3. Feed the service cable through the
electrical cover on the back of the
unit and secure using a 1/2" (1.3
cm) approved strain relief connector.
4. Remove the outer jacket and strip
the individual conductors 1/2"
(1.3 cm) from the end.
5. Follow the following instructions for
your specific installation.
6. Wiring inspection can be done from
the front of the unit: remove the
access panel, to the right of the
controls, to access the service cable
and wires from the unit.
Loading ...
Loading ...
Loading ...