Miele PW814E

User Manual - Page 8

For PW814E.

PDF File Manual, 46 pages, Read Online | Download pdf file

PW814E photo
Loading ...
Loading ...
Loading ...
Installation and planning notes
8 PW 811 / PW 814 / PW 818
Heater bank infor-
mation
To avoid damage to the heater bank the following must be observed
during commissioning:
In order to avoid unnecessary heat variations, ensure that heating is
even. Do not allow sudden bursts of steam.
To prevent corrosion, preparation of the water supply is absolutely
essential. In particular, when the machine is not in operation, it
must be ensured that no air or CO
2
can enter the steam system.
Protect the heater bank from aggressive gases.
The entire heating system must guarantee that no operating pres-
sure or temperature can arise that is higher than the details given
on the data plate.
All appropriate regulations, standards and legislation from responsi-
ble authorities and accident prevention associations for heating and
ventilation systems (in particular for the operation of the heat ex-
changer) must be observed.
Fitting informa-
tion for steam and
condensate hoses
Make sure that steam and condensate hoses are not twisted or com-
pressed. Do not use the hoses to compensate for connection tube
misalignments!
Loading ...
Loading ...
Loading ...