Puretec Z1-BL1 Tripla Black Series Hot and Cold Mixer Tap with Filter System

User Manual - Page 12

For Z1-BL1.

PDF File Manual, 20 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
12 Installation & Operation Manual Copyright © Puretec Pty Ltd 2018
Cartridge Installation/Changeout
1. Rotate the old cartridge counterclockwise 1/4 turn, pull it out and dispose of it.
2. Remove all packaging from the new cartridge, including any wraps or caps (if
applicable).
Replacement cartridge: Z1-R
 
4. Turn on the water and check for leaks. If leaks occur, repeat step 3. If leaks persist,
discontinue use and call your supporting dealer.
 
Use Guidelines
Minimum operating pressure 172 kPa.
Maximum operating pressure 500 kPa.
Do not allow exposure to temperatures below 0°C, protect from freezing.
Maximum operating temperature 38°C.
 
This system must be installed according to local plumbing codes on the cold water
line.
Replacement Cartridges: See Installation/Changeout
 

replacement frequency.
 

Filter Cartridge Installation
Loading ...
Loading ...
Loading ...