Mastech MS5202 High Voltage Insulation Tester

OPERATOR’S MANUAL - Page 20

For MS5202.

PDF File Manual, 26 pages, Read Online | Download pdf file

MS5202 photo
Loading ...
Loading ...
Loading ...
DIGITAL + ANALOGUE HIGH VOLTAGE INSULATION TESTER
OPERATOR’S MANUAL
OPERATING INSTRUCTION
4.5.5 Press the button and clockwise rotate it to “LOCK” position for locking the measured button, then
continuous measurement can be realized.
4.5.6 LED on the dial will flash. The reading can be gotten from the green scale after the flash of green
LED; or from the red scale after the flash of red LED.
4.5.7 Loosen the button after the measurement, wait several seconds and then disconnect the test line
from the tested circuit, which is to release the charge stored in the circuit.
ATTENTION
Due to huge power consumption in the measurement, continuous measurements for long time should be
avoided.
Warning
Never touch the circuit under test during insulation measuring.
Never rotate the range switch while the test button is pressed. This may damage the meter.
When measuring is complete ensure that the test button is released before the test clips are
disconnected. This is because the system may be charged up and it must be allowed to
discharge through the tester's internal discharge resistor.
- 17 -
Loading ...
Loading ...
Loading ...