Loading ...
Loading ...
Loading ...
7. Secureflangekeeperremovedearlierwith lock nuts and screws.
Tightendownnuts securingtheothertwo flangekeepers.See
Figure5.
8. If notalreadydone,slip the cablesthat run fromthe handle
panelto the dischargechuteintothe cableguide locatedontop
of the engine.See Figure4.
9. If notalreadydone,wrapthe wire of the headlampwire harness
down the righthandleuntil thewire canbe pluggedintothe
enginealternatorwireconnectordownonthe engine.
10. Normallythe cableties holdingthe steeringcablesagainstthe
handlearelooselyinstalledoneachside of the lowerhandleat
the factory.Pullthecable tiestightto secure.Cut the excess
fromthe endsof cable ties.
The extensioncord is fastenedwith a cabletie to the rearof theauger
housingfor shippingpurposes.Cut the cabletie and removeit before
operatingthesnow thrower.
1/
ii
..............
SET-UP
Chute Clean-Out Tool
Achute clean-out tool is fastenedto the top of the augerhousing
witha mountingclip.SeeFigure6.The tool is designedto cleara
chuteassemblyof ice andsnow.Thisitemis fastenedwith a cabletie
at the factory.Cutthe cabletie beforeoperatingthe snow thrower.
Drift Cutters
1. Removethe two screwsand lock nutsthat secureeachdrift
cutter,andremovethemfromthesides of the auger housing.
2. Turnthe drift cuttersaroundandpositionthemasshown in Figure
7 to the outsideof the augerhousing.
3. Attachthe drift cutterswith the screwsandlocknutsremoved
earlier.
Figure4
\
Figure5
:hule Clean-out Tool
Figure7
9
Figure6
Loading ...
Loading ...
Loading ...