GE - General Electric GXSL55F GE water system

User Manual - Page 13

For GXSL55F.

PDF File Manual, 24 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Installation Instructions.
MountingSystemInstallation
Mounting System to Screws Installed in Wall
1. Remo_' shl_nk %_r_[)/_'()_ /iher system.
2 Hang tile system on the previously installed screws using the
openings on the back of the/lnit (Fig. 9).
3. If the head of the screw will not slide into the upper slot, back out
the screw by 1/4 turn and try again.
4. II the system is too loose when placed on the wall, tighten the screws
b} 1/4 turn and It} ag;_in until a desired tit is a(hie_'d.
Instruccionesde instalaciOn.
Montaje delsistema
Montaje del sistema a los tornillos instalados en la pared
1. Remueva la envohura de pliegue del sistema del tilu'o.
2. Cuelgue el sistema en los tornillos pre_{alIlente insmlados usando las
aberturas en la parte posterior de la mfidad (Fig. 9).
3. Si la cabeza de los tornillos no se deslizan en las rmmras superiores,
destomille 1/4 de vueha y trate de nuevo.
4. Si el sistema estfi demasiado flQjo cuando sea colocado en la pared,
apriete los tornillos 1/4 de vueha y tmte de mmvo basra que el @_ste
apropiado sea logxado.
Min.
Fig. 9
/3
Loading ...
Loading ...
Loading ...