Loading ...
Loading ...
Loading ...
EZ LINK SYSTEM DUAL INSTALLATION
70
17. Turn on the controller by pressing the on / off ( ) button, if one is installed.
The on / off operating light and the priority light will both glow.
18. Check to ensure the flow from each connected hot tap is sufficient to operate a water heater.
Open each hot tap independently.
One of the water heaters will operate automatically.
The minimum operating flow rate for each water heater is 2.0 Litres per minute.
19. Increase the hot water flow by turning on multiple hot taps until both of the water heaters operate to ensure
the EZ Link system is working correctly.
20. Turn off the hot taps.
Refer to
“Commissioning” on page 79 for details on completing the installation.
Control Board with EZ Link Connection
874 and 876 series 812, 816, T16, 820, 826 and T26 models
Loading ...
Loading ...
Loading ...