Weil-McLain EGH COMMERCIAL GAS BOILER EGH-105 Commercial Gas Steam Boiler

User Manual - Page 31

For EGH COMMERCIAL GAS BOILER EGH-105.

PDF File Manual, 40 pages, Read Online | Download pdf file

EGH COMMERCIAL GAS BOILER EGH-105 photo
Loading ...
Loading ...
Loading ...
3DUW1XPEHU
31
SerYLFe and maLntenanFe (continued)
3ERVICE
Gauge glass (steam boilers)
Normal waterline is halfway up gauge glass. Clean
when needed.
1. Close lower gauge cock.
2. Open pet cock.
3. Open lower gauge cock and allow a small amount of water to
flush out through open pet cock.
4. Close pet cock.
5. Open lower gauge cock.
Temperature sensor
1. The temperature sensor may accumulate deposits on the
probe surface. Annual inspection and cleaning of the probe
will improve boiler performance.
Disconnect power, unplug harness from sensor.
a. Drain boiler water to a level below the sensor.
b. Remove sensor from boiler.
c. Wipe any built up contaminates from probe and insulator
surfaces.
d. Reinstall sensor into boiler
Boiler pressure must be low to eliminate potential
of severe burns.
If gauge glass breaks, close both gauge cocks. Replace
gauge glass. Do not replace with thin glass tubing.
Failure to comply could cause severe personal injury,
death or substantial property damage.
3TARTUP
1. Perform “Start-up procedures in this manual, pages 24–27,
including “Verify operation of burners and vent damper on
page 26.
2. C
heck gas piping, per pages 22 and 24, verifying no indica-
tions of leakage and all piping and connections are in good
condition.
3. Read the “Operating Instructions” in the Control Supplement.
4. Start the boiler following the “Operating Instructions.
#HECKTEST
Gas piping
1. Sniff near floor and around boiler area for any indication of
a gas leak.
2. Test gas piping using bubble test, per page 22 of this manual,
if there is any indication of a leak.
Boiler waterline
Normal waterline is halfway up gauge glass.
Limit controls
1. Inspect and test the boiler limit control. Verify operation by
turning control set point below boiler pressure. Boiler should
cycle off. Return dial to original setting.
Probe-type low water cutoff (when used)
Clean probe-type low water cutoff (when used) for
proper operation.
1. Turn off power to boiler and wait 5 minutes.
2. Drain water to bottom of gauge glass.
3. Turn on power.
4. Set thermostat to call for heat. Red neon lamp on lower water
cutoff should light.
5. Wait 5 minutes. Boiler should not fire.
6. Refill boiler to correct waterline. Red lamp should go off.
7. Wait 5 minutes. Boiler should fire.
 2ETURNTHERMOSTATTONORMALSETTING
Float-type low water cutoff (when used)
Clean float-type low water cutoff to clear float
chamber of sediment.
1. Open blowdown valve at bottom control.
2. Drain water into a bucket.
Scald potential. Boiler pressure must be low to avoid
the potential of severe burns from steam.
3. Check float-type low water cutoff for proper operation:
a. Turn operating control to call for heat.
b. Before water gets hot, drain to bottom of gauge glass. Boiler
should shut off after water level lowers a few inches.
c. Refill boiler to correct waterline. Boiler should come back on.
EG
&
PEG SERIES 5
s
EGH SERIES 5 GAS-FIRED BOILERSBOILER MANUAL
Loading ...
Loading ...
Loading ...