GE - General Electric AZ21E09D Legacy

User Manual - Page 7

For AZ21E09D.

PDF File Manual, 16 pages, Download pdf file

Loading ...
Loading ...
Loading ...
7
INSTALLATION INSTRUCTIONS
BEFORE YOU BEGIN
Read these instructions completely and
carefully.
IMPORTANT—Observe all governing codes and
ordinances.
INSTALLER—Be sure to leave these
instructions with the Consumer.
CONSUMER—Keep these instructions for
future reference.
CAUTION
Before starting the installation, the power to
the direct connect wiring should be OFF.
THE GE ZONELINE
®
* Shipped with the chassis
**Check essential elements list on chassis
ELECTRICAL REQUIREMENTS
FOR PERSONAL SAFETY:
Follow National Electrical Code (NEC) and
local codes, ordinances and regulations. All
wiring—including installation of receptacle,
must be in accordance with these codes.
This unit must be properly grounded.
Do not use an extension cord with this unit.
NEC requires permanent connection for
installations over 250 volts.
Protective devices (fuses or circuit breakers)
acceptable for Zoneline installations are
specified on the nameplate of each unit.
Aluminum building wiring may pose special
problems—consult a qualified electrician.
Disconnect power to the air conditioner before
servicing by:
1. Removing the power cord from the wall
receptacle, if it has one.
2. Removing the branch circuit fuses or turning
the circuit breakers off at the panel.
TOOLS NEEDED
Phillips screwdriver
Flat Blade screwdriver
Exterior Grille/Louver**
Wall Case**
Chassis
Room Cabinet*
WALL CASE & GRILLE
1. The RAB 70 or 77 Wall Case must be properly
installed per instructions packed with the case.
2. Remove the corrugated stiffener and the
outdoor protective panel. Use the slit in the
outdoor panel as a handhold and push out.
3. Install the Exterior Grille from the room side
per instruction packed with the grille.
Protective Panel
Slit
Stiffener
Loading ...
Loading ...
Loading ...