Loading ...
Loading ...
Loading ...
Installation & Owner’s Guide QW-JOIST 11
NOTE:
The system labels are an integral part of the heating
system and must be attached as noted here. Failure to
attach system labels is in violation of the warranty and
may result in revocation of the warranty.
Complete the installation
1. Install control device and connect to electrical panel box. Install and wire the control device according to
manufacturer’s instructions in the junction box added at the beginning of Part 3 — Installation. Now, depending
upon your wire lead installation, run the lead wires from the individual mat(s) along the base of the wall and up
to the junction box. Wire the heating mats to the control according to the manufacturer’s instructions using the
12/2 Romex wire.
2. Install thermal insulation. The insulation may be installed in the normal manner.
3. Finish the floor in any normal fashion.
4. Install a floor covering in accordance with the designer’s notes.
CAUTION:
Any material used as a floor surface
must be appropriate
NOTE:
Tuck insulation up at the end of each panel set
so that it seals in the heating panel set. This will
help keep heat from escaping and improve the
efficiency of the system.
Loading ...
Loading ...
Loading ...