Loading ...
Loading ...
Loading ...
Installation & Owner’s Guide QW-JOIST 5
SECTION 3. Installation
Install the control device box
Install a junction box for the control device. If this device is a thermostat, the box should be located, unobstructed,
on an insulated inside wall so that the device reads accurately.
Prepare the heating panels
Prepare all heating panels for each room at one time prior to starting installation. Test each mat with ohms meter
for resistance readiness. Record the resistance readings in the included chart
1. Cut the panel(s) to length (if needed). Using a knife or scissors, cut panel sets according the layout made in
Part 1. Ensure to cut full single panels - never cut a partial panel.
2. Insulate the cut other end of each bus bar on panel opposite the lead wires. Place a length of electrical
tape over the exposed end of each bus bar opposite the electrical connector.
NOTE:
Panels must be installed as
outlined in these instructions.
Cut heating panels only along
the dashed “cut here” lines.
DO NOT remove partial panels
Loading ...
Loading ...
Loading ...