Pioneer FYB012GMFILCAD Floor Console Split Ductless Inverter

User Manual - Page 12

For FYB012GMFILCAD.

PDF File Manual, 18 pages, Read Online | Download pdf file

FYB012GMFILCAD photo
Loading ...
Loading ...
Loading ...
10
installation manual
CAUTION
NOTE
NOTE
All the pictures in this manual are for explanation purpose only.
They may be slightly different from the air conditioner you
purchased(depend on model).The actual shape shall prevail.
9. WIRING
The appliance shall be installed in accordance with
natioanl wiring regualtions.
The air conditioner should use separate power supply
with rated voltage.
The external power supply to the air conditioner should
have ground wiring, which is linked to the ground wiring
of the indoor and outdoor unit.
The wiring work should be done by qualified persons
according to circuit drawing.
An all-pole disconnection device which has at least 3mm
separation distance in all pole and a residual current
device(RCD)with the rating of above 10mA shall be
incorporated in the fixed wiring according to the national
rule.
Be sure to locate the power wiring and the signal wring
well to avoid cross-disturbance.
Do not turn on the power until you have checked
carefully after wiring.
Remark per EMC Directive 89/336/EEC
For to prevent flicker impressions during the start of the
compressor (technical process) ,following installation
conditions do apply.
The power connection for the air conditioner has to be
done at the main power distribution. The distribution has
to be of a low impedance, normally the required
impedance reaches at a 32 A fusing point.
No other equipment has to be connected with this power
line.
For detailed installation acceptance please refer to your
power supplier, if restrictions do apply for products like
washing machines, air conditioners or electrical ovens.
1
2
3
Seal
The base pan hole
of outdoor unit
Drain joint
Seal
The base pan
of outdoor unit
Drain
joint
Fig.8-2
NOTE
Remove the electric cover of the outdoor unit.
If there is no cover on the outdoor unit, disassemble
the bolts from the maintenance board and remove the
protection board. (See Fig.9-2)
The installation bearer of sensing device rotated to another
side, and then takes off cover of electrical box. (Take off the
electrical box if the capacity is 18000btu/h as well as using
network function.)
(Refer to Fig.9-1)
Connect the cable
9.1
For power details of the air conditioner refer to the rating
plate of the product.
For any question contact your local dealer.
4
5
All the pictures in this manual are for explanation
purpose only. They may be slightly different from the air
conditioner you purchased(depend on model).The
actual shape shall prevail.
Installation bearer
of sensing device
Fig.9-1
Fig.9-2
Cover
Scre
w
Loading ...
Loading ...
Loading ...