Loading ...
Loading ...
Loading ...
8
49-80549-4
INSTALLATION CLEARANCES
These vent hoods are designed to be installed onto
a wall. They may be installed beneath a soffit or
cabinet.
Install these hoods between the required 24”
PLQLPXPDQGµUHFRPPHQGHGPD[LPXPDERYH
the cooking surface.
The vent hood must be installed between the
required 24” minimum and recommended 36”
PD[LPXPDERYHWKHFRRNLQJVXUIDFH7KHKRRG
installation height above the cooking surface
depends upon ceiling height and duct cover
limitations. The telescopic duct cover conceals the
ductwork running from the top of the hood to the
ceiling. For supplied duct cover ceiling heights, see
table on page 12.
5HFLUFXODWLRQ.LW
Kit includes 1 air deflector and 1 charcoal filter and
is included with the hood.
NOTE: Installation height should be measured
from the cooking surface to the lowest part of the
hood. This hood may be installed onto a wall and
vented to the outdoors, or it can be installed for
recirculating operation. For recirculation operation,
a Recirculating Kit (included) is required.
24” Required Min.
µ5HFRPPHQGHG0D[
ADVANCE PLANNING
Duct Install Planning
This hood is designed to be vented vertically
through the ceiling. A duct transition piece is
VXSSOLHGIRUYHUWLFDOH[KDXVW8VHORFDOO\VXSSOLHG
elbows to vent horizontally through the rear wall.
• Use metal ductwork only.
'HWHUPLQHWKHH[DFWORFDWLRQRIWKHYHQWKRRG
3ODQWKHURXWHIRUYHQWLQJH[KDXVWWRWKHRXWGRRUV
7RPD[LPL]HWKHYHQWLODWLRQSHUIRUPDQFHRIWKH
YHQWV\VWHP
1. Minimize the duct run length and number of
transitions and elbows.
2. Maintain a constant duct size.
3. Seal all joints with duct tape to prevent any leaks.
'RQRWXVHDQ\W\SHRIIOH[LEOHGXFWLQJ
Use the shortest and straightest duct route
possible.
Install a wall cap or roof cap with damper at
WKHH[WHULRURSHQLQJ2UGHUWKHZDOORUURRIFDS
and any transition and length of duct needed in
advance.
When applicable, install any makeup (replacement)
air system in accordance with local building code
requirements. Visit GEAppliances.com for available
makeup air solutions.
Wall Framing for Adequate Support
This vent hood is heavy. Adequate structural
support must be provided. The hood must be
secured to vertical studs in the wall. See page 13.
We strongly recommend that the vent hood with
duct cover be on site before final framing and
wall finishing. This will also help to accurately
locate the ductwork and electrical service.
Installation Preparation
PREPARE TO INSTALL THE HOOD
Loading ...
Loading ...
Loading ...