Loading ...
Loading ...
Loading ...
Installing a 3-wire conduit
Aluminum building wire may be used but it must be rated for the correct
amperage and voltage. Connect the wires as described below.
The wire you use, the location and enclosure of splices, etc., must conform to
good wiring practices and local codes.
1. Loosen the 3 lower terminal screws
from the terminal block.
2. Insert the center bare wire (white/
neutral) tip through the bottom
center terminal block opening. On
certain models, the wire will need
to be inserted through the ground
strap opening and then into the
bottom center block opening.
3. Insert the two side bare wire tips
into the lower left and the lower
right terminal block openings.
4. Tighten the screws until the wire is
firmly secured (35 to 50 inch-lbs.).
Do not over-tighten the screws
since it could damage the wires.
5. Go to Step 5 on page 15 to
continue with the installation.
White
Black
Red
Ground
strap
Neutral
terminal
Wire tips
Red
White
Black
Live 2
Live 1
CAUTION
CAUTION You must check voltage after connecting power cord.
Live 1 - Neutral 120 V
Live 2 - Neutral 120 V
Live 1 - Live 2 208 V / 240 V
English - 14
Loading ...
Loading ...
Loading ...