Loading ...
Loading ...
Loading ...
9
installed these rear wheels will keep the unit from moving if you step on the
foot brakes (See Figure 2):
2. Install the beer tower assembly and the mixed ball valve:
a) Plug the beer tower assembly into the top cover of the beer dispenser:
3.0” tower: This does not require a tower
buckle. Put beer tower directly over the
hole at the top of the beer dispenser’s
upper surface. Fix the beer tower assem-
bly with screws directly on the upper sur-
face of the beer dispenser. (See Fig. 3).
2.5” tower: This requires the tower buckle.
Place the beer tower at the hole in the upper surface of the beer dispenser
at an inclination of 60°, and rotate 60° clockwise along the card slot. Be
sure the tap is facing toward the front of the machine. Attach the beer tower
with washers (See Figure 4).
b) Take out the accessories of the mixed ball valve. Attach the transparent
hose to the beer outlet of the mixed ball valve (See Figure 5).
3. Install CO
2
gas cylinder and CO
2
regulator valve:
a) Fix the two CO
2
hose clamps on the red
CO
2
tube (See Figure 6).
b) Connect the ends of the red CO
2
tube
respectively to the CO
2
intake port of the
mixed ball valve and the round outlet of
the CO
2
regulator valve. Lock these
connections firmly with the two clamps on
the red CO
2
tube (See Figure 7).
c) Using the wrench, tighten the CO
2
regulator table valve with the hex nut port
to the gas outlet of the CO
2
tank (See Figure 8).
CO
2
regulator
valve
Safety switch
Red CO2 tube
Bracket and retainer
of CO
2
tank
Regulating
table
CO
2
gas
cylinder
Loading ...
Loading ...
Loading ...