Rinnai 32 Energysaver Operation & Installation Manual
INSTALLATION & COMMISSIONING CHECKLIST
Complete the Installation Check List and the Installer details below.
Instruct customer on the operation of the Energysaver.
Ensure the customer understands the content of this manual.
Attention Installer - Have you checked?
*If you have answered NO to any of the above, you must correct before appliance hand-over to the customer.
Advise the customer that during the initial burning in period of approximately 2 hours, some
vapour and smell may be emitted from the heater. This is normal operation for a new heater.
During this period the heater should be operated on ‘High’ and the space being heated should
be well ventilated.
The grill louvre and rear cover fitted to this appliance reduces the risk of fire and injury, no part
of it should be permanently removed.
Ensure the Customer understands that:
No part of this appliance should be permanently removed.
Paper or other material must not be forced into the louvres of this appliance.
Young children and the infirm should be supervised at all times while in the vicinity of this
appliance while it is in operation or able to be turned on.
Yes
/
*No
1. Is the appliance positioned in a suitable location (clearances, combustible clearances mantels and
surrounds etc)?
2. Have all packaging / protective materials been removed prior to operation?
3. The Appliance Test Point (Burner) Pressure is correct for it's particular installation / flue
configuration and adjusted if necessary.
4. Have you used only Rinnai Energysaver® flueing components?
5. That the air inlet hose and flue connections are sound?
6. That the Appliance is secured to the wall as per Installation manual?
7. Gas Supply pipe is purged of foreign matter before connection?
8. That gas connections are correct?
9. Have you turned on the power?
10.Is the appliance inlet pressure correct with all other resident gas appliances operating?
11.Have you shown the customer how to operate the heater and informed them of the safety
requirements?
12.Where applicable, have you connected the condensation drain hose in accordance with the
Installation manual?
13.Have you checked the flue clearances and installation as per the Installation manual and as per
AS/NZS 5601?
14.Have you filled out the "Installation Record" found at the front of this manual?
15.Is the end-user fully aware of the servicing schedule?
16.Have you completed the "Energysaver® Commissioning Check List" attached to the front of the
Appliance?
17.Have you left this Operation and Installation manual with the customer?
NOTE
WARNING