En-4
4-1.PURGINGPROCEDURESANDLEAKTEST
3-2. PIPE CONNECTION
1)Applyathincoatofrefrigerationoil(G)tothearedendsofthepipesandthepipeconnectionsoftheout-
door unit. Do not apply refrigeration oil on screw threads. Excessive tightening torque will result in damage
on the screw.
2)Alignthecenterofthepipewiththatofthepipeconnectionsoftheoutdoorunit,thenhandtightentheare
nut 3 to 4 turns.
3)Tightenthearenutwithatorquewrenchasspeciedinthetable.
•Over-tighteningmaycausedamagetothearenut,resultinginrefrigerantleakage.
Be sure to wrap insulation around the piping. Direct contact with the bare piping may result in burns or
frostbite.
3-3. INSULATION AND TAPING
1) Cover piping joints with pipe cover.
2) For outdoor unit side, surely insulate every piping including valves.
3) Using piping tape (E), apply taping starting from the entry of outdoor unit.
Stop the end of piping tape (E) with tape (with adhesive agent attached).
When piping have to be arranged through above ceiling, closet or where the temperature and humidity
are high, wind additional commercially sold insulation to prevent condensation.
4. PURGINGPROCEDURES,LEAKTEST,ANDTESTRUN
1) Remove service port cap of stop valve on the side of the outdoor
unit gas pipe. (The stop valves are fully closed and covered in caps
in their initial state.)
2) Connect gauge manifold valve and vacuum pump to service port of
stop valve on the gas pipe side of the outdoor unit.
3) Run the vacuum pump. (Vacuumize for more than 15 minutes.)
4) Check the vacuum with gauge manifold valve, then close gauge
manifold valve, and stop the vacuum pump.
5) Leave as it is for one or two minutes. Make sure the pointer of
gauge manifold valve remains in the same position. Conrm that
pressure gauge shows -0.101 MPa [Gauge] (-760 mmHg).
6) Remove gauge manifold valve quickly from service port of stop
valve.
7)
Fully open all stop valves on the gas pipe and the liquid pipe. Oper-
ating
without fully opening lowers the performance and this causes
trouble.
8)
Refer to 1-2., and charge the prescribed amount of refrigerant if
needed. Be sure to charge slowly with liquid refrigerant. Otherwise,
composition of the refrigerant in the system may be changed and
affect performance of the air conditioner.
9) Tighten cap of service port to obtain the initial status.
10
) Leak test
WARNING
When installing the unit, securely
connect the refrigerant pipes before
starting the compressor.
CAUTION
When there are the ports which are
not used, make sure their nuts are
tightened securely.
Stop valve
for GAS
Stop valve
cap (Torque
19.6 to 29.4
N•m, 200 to
300 kgf•cm)
Gauge manifold
valve (for R410A)
Compound pressure
gauge (for R410A)
–0.101 MPa
(–760
mmHg)
Handle
Low
Handle
High
Vacuum pump
(for R410A)
*Close
*Open
Hexagonal
wrench
*4 to 5 turns
Stop valve
for LIQUID
Pressure gauge
(for R410A)
Precautions when using
the control valve
When attaching the control valve to
the service port, valve core may de-
form or loosen if excess pressure is
applied. This may cause gas leak.
Service
port
Charge hose
(for R410A)
Body
Close
Open
Control
valve
A
When attaching the control valve to
the service port, make sure that the
valve core is in closed position, and
then tighten part A. Do not tighten
part A or turn the body when valve
core is in open position.
Service port cap
(Torque 13.7 to 17.7 N•m,
140 to 180 kgf
•cm)
Charge
hose
(for R410A)
4-2.GASCHARGE
Perform gas charge to unit.
1) Connect gas cylinder to the service port of stop valve.
2) Perform air purge of the pipe (or hose) coming from refrigerant gas cylinder.
3)Replenish specied amountof the refrigerant, while operatingthe air condi-
tioner
for cooling.
Note:
In
caseofaddingrefrigerant,complywiththequantityspeciedfortherefrigerat-
ing
cycle.
CAUTION:
When
charging the refrigerant system with additional refrigerant, be sure to use
liquid refrigerant. Adding gas refrigerant may change the composition of the
refrigerant in the system and affect normal operation of the air conditioner. Also,
charge the liquid refrigerant slowly, otherwise the compressor will be locked.
To maintain the high pressure of the gas cylinder, warm the gas cylinder with
warmwater(under40°C)duringcoldseason.Butneverusenakedreorsteam.
Refrigerant gas
cylinder
operating
valve
(for R410A)
Indoor
unit
Charge
hose (for R410A)
Refrigerant gas cylinder
for R410A with siphon
Electronic scale for
refrigerant charging
Refrigerant (liquid)
Indoor
unit
Union
Union
Liquid
pipe
Gas pipe
Liquid pipe
Gas pipe
Stop valve
Service port
Outdoor
unit
Gauge
manifold
valve (for R410A)
JG79A641H01_en.indd 4 2013/09/06 15:47:06